project overview
EHS 2 is comprised of 7,356 gsf on one level for waste-handling facilities to support UCD academic facilities at the Anschutz Medical Campus. The support facility is a facility for the purpose of packaging, shipping and limited treatment of process waste/materials at the Anschutz Medical Campus. The facility includes processing and holding space for campus waste. Space components include process waste storage areas and related building support space. The total project cost for EHS 2 was $2.1 million. EHS 2 was designed by LOA Architects based on a design-bid-build construction method. Construction was completed in February 2007.